Pro-beam Electron Beam Welding System K-2

pro beam K 2

pro beam K 2

Mobile and space-saving

 

The K 2 welding system is the perfect solution for prototype and small-batch production and for use in research and development.

 

 

This system requires less space thanks to its small footprint. In addition, relocation of equipment is easy, as all elements are mounted on one frame. This helps to facilitate transport and installation. The standard equipment comes with a turning device for the processing of small, medium and large cylindrical components. The system is also available with an optional gate shuttle system for loading and unloading of components during production to increase productivity and availability.

 

At a glance
  • Compact version with a minimum footprint
  • Easy relocation
  • Ideal for prototype and small-batch production as well as research and development
  • Optionally available with a gate shuttle system
Technical data

CHAMBER VOLUME:
0.2 m³

MAX. HIGH VOLTAGE:
60 kV

BEAM POWER:
6 kW

WORK SPACE:
800 mm x 500 mm x 450 mm

 

Strategic Partners

BCT GmbH
CIMCO
pro beam
TD NDE

Get in Touch

BCT Adaptive Solutions (Asia) Pte Ltd

A12 New Industrial Road, #08-01
Singapore 536202

T+65 6858 0388

F+65 6280 9488